The most commercially useful structure we have ever installed on a building had almost nothing to do with weather. A completed multi-level residential development could not close out its wet areas: the pools and water features needed covering before finishing trades could work above and around them, and until those trades were finished, sold apartments could not settle. Settlement delay on a finished building is expensive in a way a rainy week never is. An engineered temporary cover, installed for the duration of the works, was what released the program.
That is the question worth asking on any remedial job. Not “will this keep the rain off”, but “what is the completion or settlement date this unlocks”.
A cover that cannot be signed off does not go on a building, so we only offer engineered structures and we supply the engineering documentation with them. On an occupied or completed building that matters twice over, because the structure has to satisfy both the builder’s safety case and a body corporate or asset owner who will be living with the surfaces underneath.
Anchoring and load transfer are specified so that finished surfaces, membranes and waterproofing are not compromised — the method is worked out for your building rather than assumed. Our crews include White Card holders, and we work to the site’s induction, permit and exclusion-zone requirements as a matter of course.
Remedial works are crowded. Scaffold is already up or going up, swing stages need drop zones and travel paths kept clear, containment and debris netting change what can be fixed where, and hoist or crane time is rationed between trades. Our structures have to fit into that, which is why we scope from the scaffold layout and the trade sequence rather than from a floor plan.
Access is usually the constraint that dictates design. Components have to arrive in sizes that fit the available route and the available lift, and the install has to happen inside whatever window the other trades leave open.
Once a building is finished, the cost of damage is no longer in the materials, it is in the rectification and the delay. We cover pools, water features, spas and wet areas, podium and terrace finishes, completed floors and lobbies, and anything below works that will shed water, dust or debris.
The brief in these cases is containment rather than shelter: keep what is being dropped from reaching what has already been paid for, while leaving trades enough room and light to work.
Occupied buildings add a second audience. Residents and tenants still use the entries, lifts and car parks we are working around, so install noise, access routes and the hours we work get agreed rather than assumed. Excel Event Hire plans these jobs with the building manager as well as the builder, because a cover that upsets the occupants creates a different kind of delay.
Facade and remedial programs rarely stay in one place. Works move elevation by elevation, level by level, and the cover has to follow. We install, strike, relocate and reinstall as the program moves, and we keep the records from each move so the next one is quicker. Repeat clients get the benefit of that history: positions, anchor details and access routes are known rather than re-solved.
Related work is set out on our construction and civil sites hub, with the weather argument on our temporary weather protection page. You can also browse marquee hire or contact us.